Everything about Hoover Dam totally explained

Hoover Dam, also known as Boulder Dam, is a concrete arch-gravity dam in the Black Canyon of the Colorado River, on the border between the U.S. states of Arizona and Nevada. When completed in 1935, it was both the world's largest electric power producing facility and the world's largest concrete structure. It was surpassed in both respects by the Grand Coulee Dam in 1945. It is currently the world's 34th largest hydroelectric generating station.
   The dam, located 30 miles (48 km) southeast of Las Vegas, is named after Herbert Hoover, who played an instrumental role in its construction, first as Secretary of Commerce and then later as President of the United States. Construction began in 1931 and was completed in 1935, more than two years ahead of schedule. The dam and the power plant are operated by the Bureau of Reclamation of the U.S. Department of the Interior. Listed on the National Register of Historic Places in 1981, Hoover Dam was designated a National Historic Landmark in 1985. Lake Mead is the reservoir created behind the dam, named after Elwood Mead, who oversaw the construction of the dam.

Planning and agreements

A commission was formed in 1922 with a representative from each of the Basin states and one from the Federal Government. The federal representative was Herbert Hoover, then Secretary of Commerce under President Warren Harding. In January 1922, Hoover met with the state governors of Arizona, California, Colorado, Nevada, New Mexico, Utah and Wyoming to work out an equitable arrangement for apportioning the waters of the Colorado River for their states' use. The resulting Colorado River Compact, signed on November 24, 1922, split the river basin into upper and lower halves with the states within each region deciding how the water would be divided. This agreement, known as the Hoover Compromise, paved the way for the Boulder Dam Project. It was built to help keep the silt and sediment out of the Colorado River.
The first attempt to gain Congressional approval for construction of Boulder Dam came in 1922 with the introduction of two bills in the House of Representatives and the Senate. The bills were introduced by Congressman Phil D. Swing and Senator Hiram W. Johnson and were known as the Swing-Johnson bills. The bills failed to come up for a vote and were subsequently reintroduced several times. In December 1928, both the House and the Senate finally approved the bill and sent it to the President for approval. On December 21, 1928, President Calvin Coolidge signed the bill approving the Boulder Canyon Project. The initial appropriation for construction was made in July 1930, by which time Herbert Hoover had become President.
   Early plans called for the dam to be built in Boulder Canyon, so the project was known as the Boulder Canyon Project. The dam site was eventually moved downstream eight miles to Black Canyon, but the project name remained the same.

Contractors

The contract to make the Boulder Dam was awarded to Six Companies, Inc. on March 11, 1931, a joint venture of Morrison-Knudsen Company of Boise, Idaho; Utah Construction Company of Ogden, Utah; Pacific Bridge Company of Portland, Oregon; Henry J. Kaiser & W. A. Bechtel Company of Oakland, California; MacDonald & Kahn Ltd. of Los Angeles; and the J.F. Shea Company of Portland, Oregon. The chief executive of Six Companies, Frank Crowe, had previously invented many of the techniques used to build the dam.
   During the concrete-pouring and curing portion of construction, it was necessary to circulate refrigerated water through tubes in the concrete. This was to remove the heat generated by the chemical reactions that solidify the concrete, since the setting and curing of the concrete was calculated to take about 125 years. Six Companies, Inc., did much of this work, but it discovered that such a large refrigeration project was beyond its expertise. Hence, the Union Carbide Corporation was contracted to assist with the refrigeration needs.
   Six Companies, Inc. was contracted to build a new town called Boulder City for workers, but the construction schedule for the dam was accelerated in order to create more jobs in response to the onset of the Great Depression, and the town wasn't ready when the first dam workers arrived at the site in early 1931. During the first summer of construction, workers and their families were housed in temporary camps like Ragtown while work on the town progressed. Discontent with Ragtown and dangerous working conditions at the dam site led to a strike on August 8, 1931. Six Companies responded by sending in strike-breakers with guns and clubs, and the strike was soon quelled. But the discontent prompted the authorities to speed up the construction of Boulder City, and by the spring of 1932 Ragtown had been deserted. Gambling, drinking and prostitution were not permitted in Boulder City during construction. To this day Boulder City is the only location in Nevada not to allow gambling, and the sale of alcohol was illegal until 1969.
   While working in the tunnels, many workers suffered from the carbon monoxide generated by the machinery there. The contractors claimed that the sickness was pneumonia and wasn't their responsibility. Some of the workers sickened and died because of the so-called "pneumonia". Most are uncounted on the official death list. In a court case, one of the claimants (Ed Kraus) said that the poisoning had resulted in his impotence. This was disproved after a prostitute in the pay of the contractors gave evidence. The jury failed to reach a verdict as a result, and the claim was lost.

Construction

Groundworks

To protect the construction site from flooding, two cofferdams were constructed. Construction of the upper cofferdam began in September 1932, even though the river hadn't yet been diverted. A temporary horseshoe-shaped dike protected the cofferdam on the Nevada side of the river. After the Arizona tunnels were completed, and the river diverted, the work was completed much faster. Once the coffer dams were in place and the construction site dewatered, excavation for the dam foundation began. For the dam to rest on solid rock, it was necessary to remove all loose material until solid rock was reached. Work on the foundation excavations was completed in June 1933. During excavations for the foundation, approximately 1,500,000 yd³ (1,150,000 m³) of material was removed, including material removed in canyon wall stripping operations.

River diversion

To divert the river's flow around the construction site, four diversion tunnels were driven through the canyon walls, two on the Nevada side and two on the Arizona side. These tunnels were 56 feet (17.07 m) in diameter. Their combined length was nearly 16,000 feet (4877 m, more than three miles). Tunneling began at the lower portals of the Nevada tunnels in May 1931. Shortly after, work began on two similar tunnels in the Arizona canyon wall. In March 1932, work began on lining the tunnels with concrete. First the base or invert was poured. Gantry cranes, running on rails through the entire length of each tunnel were used to place the concrete. The sidewalls were poured next. Movable sections of steel forms were used for the sidewalls. Finally, using pneumatic guns, the overheads were filled in. The concrete lining is 3 feet (914.4 mm) thick, reducing the finished tunnel diameter to 50 ft (15.24 m).
   Following the completion of the dam, the entrances to the two outer diversion tunnels were sealed at the opening and half way through the tunnels with large concrete plugs. The downstream half of the tunnels following the inner plugs are now the main body of the spillway tunnels. The spillways can be seen directly above the outer diversion tunnels. They drop sharply from their entrance point and merge directly into the old diversion tunnels. The two inner diversion tunnels have two concrete plugs in them. One is roughly half way along their length, and the other is around 75% of the way along their length. The section sandwiched between two concrete plugs is used as part of the tunnel which water travels along, to journey from the outermost intake towers and the generators. The two innermost intake towers have separate tunnels.
   The large spillway tunnels have only been used three times in the history of the dam; the first was during the second half of 1941 for testing. The second was for about six weeks during the summer of 1983, when record precipitation and snow-melt in the Colorado River basin drained into Lake Mead, and the third in 1999, again with heavy precipitation that filled Lake Mead.

Rock clearance

Before construction began on the dam itself it was necessary to remove loose rock from the canyon walls. The men who removed this rock were called "high-scalers." While suspended from the top of the canyon with ropes high-scalers climbed down the canyon walls and removed the loose rock with jackhammers and dynamite.

Concrete pouring

The first concrete was placed into the dam on June 6, 1933. Since no structure of the magnitude of the Hoover Dam had been constructed, many of the procedures used in construction of the dam were untried. Since concrete heats up and contracts as it cures, uneven cooling and contraction of the concrete posed a serious problem. The Bureau of Reclamation engineers calculated that if the dam were built in a single continuous pour, the concrete would have taken 125 years to cool to ambient temperature. The resulting stresses would have caused the dam to crack and crumble. To solve this problem the dam was built in a series of interlocking trapezoidal columns. Each pour was no more than six inches deep. Because of this depth it's extremely unlikely that construction workers were accidentally buried alive in the concrete, contrary to popular folklore. To further cool the concrete each form contained cooling coils of 1 inch (25.4 mm) thin-walled steel pipe. River water was circulated through these pipes to help dissipate the heat from the curing concrete. After this, chilled water from a refrigeration plant on the lower cofferdam was circulated through the coils to further cool the concrete. After each layer had sufficiently cooled the cooling coils were cut off and pressure grouted by pneumatic grout guns. The concrete is still curing and gaining in strength as time goes on.
   There is enough concrete in the dam to pave a two-lane highway from San Francisco to New York .

Construction deaths

There were 112 deaths associated with the construction of the dam. There are different accounts as to how many people died while working on the dam and who was the first and last to die. A popular story holds that the first person to die in the construction of Hoover Dam was J. G. Tierney, a surveyor who drowned while looking for an ideal spot for the dam. Coincidentally, his son, Patrick W. Tierney, was the last man to die working on the dam, 13 years to the day later. The bypass will include a composite steel and concrete arch bridge, tentatively named the Mike O'Callaghan-Pat Tillman Memorial Bridge.
   Traffic across Hoover Dam is now restricted. Some types of vehicles are inspected prior to crossing the dam while semi-trailer trucks, buses carrying luggage, and enclosed-box trucks over 40 feet are not allowed on the bridge at all. This traffic is diverted south to a Colorado River crossing close to Laughlin, Nevada.

Power distribution

The Bureau of Reclamation reports that the energy generated is allocated as follows:
Area ercentage
Arizona 18.9527%
Nevada 23.3706%
Metropolitan Water District of Southern California 28.5393%
Burbank, CA 0.5876%
Glendale, CA 1.5874%
Pasadena, CA 1.3629%
Los Angeles, CA 15.4229%
Southern California Edison Co. 5.5377%
Azusa, CA 0.1104%
Anaheim, CA 1.1487%
Banning, CA 0.0442%
Colton, CA 0.0884%
Riverside, CA 0.8615%
Vernon, CA 0.6185%
Boulder City, NV 1.7672%

Statistics

  • Construction period: April 20, 1931March 1, 1936
  • Construction cost: $49 million ($676 million adjusted for inflation)
  • Deaths attributed to construction: 112; 96 of them at the construction site
  • Dam height: 726.4 ft (221.4 m), second highest dam in the United States. (Only the Oroville Dam is taller)
  • Dam length: 1244 ft (379.2 m)
  • Dam thickness: 660 ft (200 m) at its base; 45 ft (15 m) thick at its crest.
  • Concrete: 4.36 million yd³ (3.33 million )
  • Electric Power produced by the water turbines: 2,080 megawatts
  • Traffic across the dam: 13,000 to 16,000 people each day, according to the Federal Highway Administration
  • Lake Mead (full pool)
    • area: 157,900 acres (639 km²), backing up 110 miles (177 km) behind the dam.
    • volume: 28,537,000 acre feet (35.200 km³) at an elevation of 1,221.4 feet (372.3 m) .
  • With 8 to 10 million visitors each year, including visitors to Hoover Dam but not all traffic across the dam, the Lake Mead National Recreation Area is the fifth busiest U.S. national park.

The naming controversy

The dam, originally planned for a location in Boulder Canyon, was relocated to Black Canyon for better impoundment, but was still known as the Boulder Dam project. Work on the project started on July 7, 1930. At the official beginning of the project on September 17, 1930, President Hoover's Secretary of the Interior Ray L. Wilbur, announced that the new dam on the Colorado River would be named Hoover Dam to honor the then President of the United States. Wilbur followed a long-standing tradition of naming important dams after the President who was in office when they were constructed, such as Wilson Dam and Coolidge Dam. Furthermore, Hoover was already campaigning for re-election in the face of the Depression and sought credit for creating jobs. A Congressional Act of February 14, 1931, made the name "Hoover Dam" official.
   In 1932, Hoover lost his bid for reelection to Franklin Delano Roosevelt. In his memoirs, Hoover writes of stopping to inspect progress on the dam, by night, on November 12, 1932 on his way back to Washington from Palo Alto after his defeat. He commented, "It does give me extraordinary pleasure to see the great dream I've so long held taking form in actual reality of stone and cement. It is now ten years since I became chairman of the Colorado River Commission.... This dam is the greatest engineering work of its character ever attempted by the hand of man." He went on to list its purposes, concluding, "I hope to be present at its final completion as a bystander. Even so I'll feel a special personal satisfaction." (Hoover adds a footnote to this, see below.)
   When Roosevelt took office on March 4, 1933, he brought Harold Ickes with him to replace Ray Lyman Wilbur as Secretary of the Interior. Ickes wasted no time removing Hoover’s name from the Boulder Canyon Project. On May 8, 1933, Ickes issued a memorandum to the Bureau of Reclamation, which was in charge of the dam, stating, "I have your reference to the text for the pamphlet descriptive of the Boulder Canyon Project for use at the Century of Progress Exposition. I'd be glad if you'll refer to the dam as 'Boulder Dam' in this pamphlet as well as in correspondence and other references to the dam as you may have occasion to make in the future."
   This didn't happen immediately, but over the following several years all references to "Hoover" Dam in official sources, as well as tourist and other promotional materials, vanished in favor of "Boulder" Dam.
   Roosevelt died in 1945 and Harold Ickes retired in 1946. On March 4, 1947 California Republican Congressman Jack Anderson submitted House Resolution 140 to "restore" the name Hoover Dam. Anderson’s resolution passed the House on March 6; a companion resolution passed the Senate on April 23, and on April 30, 1947, President Harry S. Truman signed Public Law 43 which read: "Resolved … that the name of Hoover Dam is hereby restored to the dam on the Colorado River in Black Canyon constructed under the authority of the Boulder Canyon Project Act … . Any law, regulation, document, or record of the United States in which such dam is designated or referred to under the name of Boulder Dam shall be held to refer to such dam under and by the name of Hoover Dam."
   Hoover writes this footnote to his comments of November 12, 1932: "Responding to a suggestion from Hiram Johnson, and with his characteristic attitude, Secretary Ickes changed the name of the dam. The hint in the above address that I should like to be present didn't secure me an invitation to the dedication ceremonies conducted by President Roosevelt. I've never regarded the name as important. The important thing is a gigantic engineering accomplishment that will bring happiness to millions of people. In 1947, the Congress, by practically unanimous action, restored the name Hoover Dam — to Mr. Ickes intense indignation."

Further Information

Get more info on 'Hoover Dam'.


External Link Exchanges

Do you know how hard it is to get a link from a large encyclopaedia? Well we're different and will prove it. To get a link from us just add the following HTML to your site on a relevant page:

    <a href="http://hoover_dam.totallyexplained.com">Hoover Dam Totally Explained</a>

Then simply click through this link from your web page. Our crawlers will verify your link, extract the title of your web page and instantly add a link back to it. If you like you can remove the words Totally Explained and embed the link in article text.
   As long as your link remains in place, we'll keep our link to you right here. Please play fair - our crawlers are watching. Your site must be closely related to this one's topic. Any kind of spamming, dubious practises or removing the link will result in your link from us being dropped and, potentially, your whole site being banned.



Copyright © 2007-8 totallyexplained.com | Licensed under the GNU Free Documentation License | Site Map
This article contains text from the Wikipedia article Hoover Dam (History) and is released under the GFDL | RSS Version